Sunrise Story
Sunday, July 11, 2010
Hot Summer 2008
Through the summer we went to build the columns and walls.
Next stage was to build the suspended slab, which would separate the main level from wood-frame structure of residential units above.
0 comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment